Combined Cycle El Sauz – 414 MW

Project name

Combined Cycle El Sauz – 414 MW

Location

Pedro Escobedo, Querétaro

Client

CFE

Status

Finished, commissioned in 2003

Description

EPC under the scheme of Financed Public Work from CFE.

Conditioning of a simple cycle plant with two gas turbines that accounted 271 MW, with a heat recovery boiler, a steam turbine and an air condenser as well as the auxiliary plant equipment. Abengoa has added a turbo generator of 143 MW, allowing increasing the power up to 414 MW.

Scope

Design, engineering, construction and commissioning